This is how far I have got with the Holiday cardigan. It is coming on better than I might have expected, given that I only started it on Sunday evening. I have reached (I think) milestone number 1 which is the bottom of the sleeve shaping.
I always try and find some new things to learn on every project I do - so for this one I did a casting on experiment. I tried the Italian cast on, the german, the twisted german and then finally decided that I liked the thumb cast on I normally use better. Ordinarily I would go for a tubular cast on for a ribbed edge, but in order to make the ribbing fit in with the various cables it is uneven and so I couldn't find a tubular on that could deal with that.
The other technique that is a bit new is that I have been doing all my cables without a cable needle, and though it takes a bit of getting used to (that bit involves dropping stitches, which isn't so bad considering that this wool is lovely and sticky).
The next bit gets a little more complicated, as I try and figure where to start the neck shaping and what to do with the armholes. But I need a fresh brain to think about that, it's late, my husband is asleep on the sofa under the blanket and I need to put him to bed!
In the meantime my extra 50g of cashmere is here so there is that to distract me from cables.
Tuesday, 4 March 2008
Subscribe to:
Post Comments (Atom)
1 comment:
Gosh, thats fast knitting. It looks great.
Post a Comment